Maintenance dredging is a routine activity carried out by ports around the world to keep shipping channels and berths safe for vessels. Wind, waves and river flows naturally deposit sand, silt and sediments within waterways over time. Dredging removes this material to maintain the depths needed for ships to safely access ports.
At the Port of Townsville, maintenance dredging is carefully managed under strict environmental approvals and informed by scientific monitoring, environmental assessment and regulatory oversight.
Understanding Cleveland Bay
Cleveland Bay is a large, north-facing shallow bay that is naturally turbid. A range of factors contribute to turbidity levels, including weather events, wind, tides, flooding, cyclones and sediment run-off from local waterways, as well as sediment transported from the Burdekin River. Water quality monitoring undertaken in Cleveland Bay shows that wind-driven waves are the primary driver of turbidity in the bay.

Maintenance Dredging Updates
The Port undertakes maintenance dredging as required to maintain safe shipping access and navigational depths. Information about recent and upcoming maintenance dredging activities is provided below. Queensland's statewide maintenance dredging schedule is available on the Department of Transport and Main Roads website.
Annual maintenance dredging took place in Cleveland Bay with trailing suction hopper dredge (TSHD) Brisbane undertaking two campaigns, the first from 17 August 2026 to 17 September 2026. Due to increased siltation in the inshore end of the shipping channel (Platypus Channel), TSHD Brisbane returned to undertake further maintenance dredging from 4 November 2026 to 16 November 2026. The TSHD Brisbane was intentionally scheduled to arrive after the October 2026 full moon coral spawning period. The dredging duration and associated volumes remained within the limits of all environmental approvals and permits.
Planned maintenance dredging is currently underway in the Ross River adjacent to the Townsville Marine Precinct, with works expected to conclude in mid-December 2026. Dredging commenced on 10 October 2026 and is scheduled to be completed by 18 December 2026. The work is being undertaken by trailing suction hopper dredge (TSHD) Port Frederick during daylight hours only. Works are focused on the section of the channel extending from just upstream from the Townsville Marine Precinct entrance to the mouth of Ross River, removing naturally accumulated sediment to maintain safe navigable depths for vessels. The Ross River dredging and placement areas are located more than 6km from sensitive coral reef habitats and modelling does not predict sediment plumes from the activities will affect these habitats. As an additional precaution, TSHD Frederick will not undertake dredging or sea placement during the predicted October and November full moon coral spawning periods. Dredging operations ceased from the evening of 24 October to 4 November 2026 and will again be suspended from the evening of 23 November, recommencing on 4 December 2026.
Frequently Asked Questions
[feature-block]
Information about capital dredging
This page relates to maintenance dredging which is undertaken to maintain safe navigational depths within existing shipping channels and waterways.
Information about capital dredging associated with the Port Expansion Project, including channel widening and deepening works, environmental approvals and monitoring, is available on the Channel Upgrade project pages.